Design

CJ Logistics Fulfillment Center

“Delivering Tomorrow”


We propose a new innovative logistics center for CJ Korea Express, which delivers the future. They shared the value of the company's future and vision, performed a thorough analysis of the four sites, presented an optimized plan, and expressed their willingness to respond to changes in future cutting-edge logistics. We built a system that took robot equipment operation and drone delivery into consideration, and planned a design plan to realize a TES-based automated logistics system. It contains the symbolism of CJ Korea Express by expressing the rapid flow of logistics, and expresses the image of an eco-friendly company through four themes with nature as a motif.


Design
2022
Location
Siheung-si, Gyeonggi-do, Republic of Korea / Miryang-si, Gyeongsangnam-do, Republic of Korea
Client
CJ Logistics Corporation
Floor Area
시흥:331,966.34㎡ / 밀양:199,784.60㎡
Site Area
시흥:49,840.90㎡ / 밀양:64,214.00㎡
close